Venice Dual Force Main Project Los Angeles, California

The Venice Dual Force Main Project includes the construction of a new 54-inch diameter force main sewer line approximately 0.75 miles in length. The new force main sewer will be constructed using micro-tunneling methods, utilizing pits or shafts for installation. The depth of the new line will vary from 50-70 feet below the surface.

DC Engineering Group provided traffic management services for the project which included County of Los Angeles and City of Los Angeles coordination services. DC Engineering group developed a traffic management plan to maintain safe travel through the construction sites for the project. Traffic Mitigations for the project were developed and incorporated into the traffic management plan document, worksite traffic control, and temporary traffic signal plans.